Skip links

Biban Project

Project Owner Royal Commission for Makkah City and Holy sites

Project Details

Date:

Sep 2021

Name:

Biban Project

Location:

Makkah , KSA

Contact Us

    Biban Project

    Completion of the second ring road (Phase II) Al-Biban Junction - Makkah

    Project Owner Royal Commission for Makkah City and Holy sites

    1. Construction of an intersection and a network of bridges -

    - Bridge No. 1 to the old Jeddah road in the direction of Sulaymaniyah tunnels
    - Bridge No. 2 on the intersection with Mansour Street coming from Jeddah Al-Qadi Road in the direction of Sulaymaniyah tunnels
    - Bridge on slope (C) for coming from south of Makkah and heading to Medina road and intersecting with the second ring road.
    - Bridge on slope (B) for coming from south of Makkah and heading to the Saniyah tunnels
    - A bridge on slope (A) coming from Sulaymaniyah tunnels to the south of Makkah and intersecting with the second ring road.

    2. Rock cutting of ten kilometers road

    3. Traffic controls and work areas

    4. Network of rainwater drainage and flood phrases

    5. Power grid and road lighting

    6. Agriculture and coordination of the public site